A lift included in an evacuation strategy cannot be selected from a standard passenger-lift schedule and labelled later. Knowing how to procure evacuation lifts starts with a clear understanding of who will use the lift during an incident, how they will be assisted, and how the building will remain safe while that happens. For facilities managers, project teams and building owners, the procurement decision affects life safety, compliance, operational resilience and long-term maintenance.
An evacuation lift is a planned part of a managed evacuation process. It is not simply a lift available for everyday accessible travel, nor is it automatically the same as a firefighter lift. Its design, controls, power supply, communication arrangements and protected environment must all support the approved fire strategy for the building.
The right procurement process begins before tender documents are issued. Ask the fire engineer, building control body, architect, M&E consultant and lift specialist to establish whether an evacuation lift is required, appropriate or both. This should be based on the building’s use, height, occupancy profile, evacuation approach and the needs of people who may be unable to use stairs independently.
A hospital, higher education building, large retail unit, public building or office with multiple levels may each need a different approach. Progressive horizontal evacuation in a healthcare setting, for example, creates different operational requirements from a simultaneous evacuation plan in a commercial office. The lift specification must support the strategy rather than dictate it.
This early work should identify the intended evacuation population, including wheelchair users, people with restricted mobility, visitors unfamiliar with the building and anyone needing assistance. It should also define where occupants wait, who controls the evacuation lift, how communication is maintained and what happens if the lift becomes unavailable. A refuge space alone is not an evacuation solution unless it forms part of a managed and practical plan.
A detailed employer’s requirements document prevents the most expensive procurement mistake: receiving comparable-looking tenders for fundamentally different solutions. The brief should describe performance requirements and interfaces, rather than relying on a generic lift description.
The project team should set out the required travel, rated load, car size, door configuration, speed, expected traffic and whether the lift will also operate as a passenger lift in normal conditions. Car dimensions and door widths should be considered alongside the turning space, approach routes and evacuation procedures, not in isolation.
The specification must also address the lift’s fire-protected route and landing arrangements. A well-specified lift cannot compensate for an unsuitable shaft, inadequate protected lobby, compromised fire compartmentation or poorly coordinated builder’s works. Shaft ventilation, drainage, pit protection and the location of electrical equipment all need consideration in relation to foreseeable fire and water risks.
In the UK, the design team will commonly consider BS EN 81-76, which addresses the evacuation of persons with disabilities using lifts, alongside the project fire strategy and relevant guidance such as BS 9999. Building Regulations requirements and the applicable Approved Documents must be reviewed for the particular project. Standards are not a substitute for a building-specific risk assessment, but they provide a valuable framework for defining the lift’s technical and operational capability.
A firefighter lift is designed to support firefighting and rescue operations under controlled conditions. An evacuation lift is intended for the managed evacuation of building occupants. In some buildings, one installation may need to satisfy both functions, but this should never be assumed.
The distinction matters at tender stage. A lift contractor needs an unambiguous scope covering the required operating modes, controls, protection measures and testing. Where both functions are needed, the design must coordinate the requirements properly rather than adding equipment late in the programme.
Evacuation lift procurement is not just a question of selecting a lift car and drive system. Its safe use depends on several connected building systems. These interfaces should be designed and priced from the outset:
The precise solution depends on the fire strategy. Secondary power may involve a generator, battery-backed arrangement or another engineered solution, but it must be assessed for capacity, duration, starting characteristics, testing and maintenance. A nominal back-up supply that has not been proven under lift load is not a dependable evacuation provision.
For new commercial buildings, traction lifts are often well suited to medium and higher-rise travel because of their performance and efficient operation. Hydraulic lifts can remain appropriate for some low-rise applications, particularly where building constraints influence the design. The choice should be based on duty, travel, space, maintainability and resilience, rather than a preference for one drive type.
Tender returns should be assessed against an agreed technical schedule, with exclusions made visible. A low initial price may omit builder’s work interfaces, secondary power coordination, communication systems, fire stopping, testing support, documentation or training. Those omissions are often discovered after the shaft is complete, when changes are slower and more costly.
Ask prospective contractors to explain their experience with commercial evacuation lift installations, their proposed compliance route, programme assumptions, maintenance capability and approach to commissioning. They should be able to identify missing information and clarify responsibility boundaries between the lift contractor, electrical contractor, fire alarm specialist and principal contractor.
It is also sensible to assess parts availability, local engineering support and the likely maintainability of the proposed controller and communications equipment. An evacuation lift may be used infrequently in an emergency, but it must be available every day. Obsolete components, restricted diagnostics or unclear maintenance responsibility create unnecessary operational risk.
A quality-focused procurement evaluation should consider capital cost, technical compliance, programme, whole-life maintenance, warranty terms, response arrangements and planned modernisation prospects. For an existing building, a survey of the current lift shaft, machine space or machinery location, incoming power and fire separation is essential before committing to a refurbishment solution.
During installation, the lift contractor needs timely access to a dry, secure and completed shaft, with accurate structural openings and suitable lifting arrangements. Delays in permanent power, fire alarm programming, generator commissioning or lobby completion can prevent meaningful testing even where the lift installation itself is complete.
Hold regular interface reviews during the works. These should confirm shaft readiness, entrance protection, fire-stopping responsibilities, electrical containment, drainage, communications, finishes and the sequence for integrated testing. Photographic records and clear sign-off points are particularly valuable where later finishes conceal critical building works.
For live buildings, the procurement plan should also cover temporary access, passenger management, noise, isolation periods and contingency arrangements. An evacuation lift upgrade can affect normal vertical transportation, so programme planning must account for the needs of tenants, staff, patients, students or visitors.
Commissioning is where the physical lift and evacuation procedure become one working system. The handover should include more than a standard passenger-lift test. The project team should witness the agreed evacuation modes, secondary power operation, communications, fire alarm interfaces and any control changes required by the fire strategy.
The responsible persons who will manage an incident need practical training, supported by concise operating instructions. Training should cover normal operation, activation arrangements, communication, passenger assistance, faults and escalation. It should be repeated when personnel change and incorporated into wider fire evacuation drills.
Request a complete handover pack with test evidence, certification, as-fitted information, maintenance instructions, emergency procedures and details of all third-party interfaces. The building’s fire risk assessment and evacuation plan must then be updated to reflect the installed system. A lift should not be described as an evacuation lift in building procedures until its function has been verified and the people responsible for using it are prepared.
Ongoing maintenance must reflect the lift’s life-safety role. Planned maintenance should cover the lift equipment, communication devices, emergency power arrangements and relevant interfaces, with faults escalated according to their effect on the evacuation strategy. Any building alteration, change of occupancy or fire alarm modification should trigger a review of the lift’s role.
The strongest procurement outcome is a system that remains understandable and serviceable years after practical completion. When the lift, fire strategy, building systems and trained people are planned together, evacuation provision becomes a dependable part of the building’s safety management rather than an untested assumption.