Commercial Lift Procurement Guide for UK Buildings

Commercial Lift Procurement Guide for UK Buildings

A lift specification can look complete on paper yet fail the people who rely on it at peak times. A car that is too small for hospital beds, a goods lift with inadequate loading, or a passenger lift package without a credible maintenance plan can create costly operational problems for years. This commercial lift procurement guide sets out how UK building professionals can make sound decisions before an order is placed.

Start with the building’s operational need

The first procurement decision is not the manufacturer or the finish inside the car. It is defining what the vertical transportation system must achieve in daily use, during planned maintenance and in an emergency.

For an office building, this may mean assessing morning and lunchtime traffic, tenant density, floor populations and the movement of visitors. In a school or university, lesson-change peaks, accessibility requirements and protection from heavy use may be more influential. Healthcare settings need careful consideration of bed, trolley, bariatric and clinical equipment movements, while retail and industrial premises may require separate passenger and goods-lift strategies.

A traffic analysis is particularly valuable for larger or multi-storey buildings. It helps establish the appropriate number of lifts, rated load, car size, speed and control arrangement. Specifying one larger lift rather than two smaller lifts may reduce initial capital expenditure, but it also removes resilience when the lift is out of service. Conversely, adding capacity that the building will never use increases both installation and lifetime costs. The right answer depends on the building’s occupancy, use and expected future change.

Build the commercial lift procurement brief

A clear brief allows tendering contractors to price the same requirement and makes their proposals easier to compare. It should state whether the project is a new installation, replacement, modernisation or refurbishment, together with site constraints, programme milestones and the responsibilities of the principal contractor and other trades.

The brief should cover the lift’s intended users and movements, required rated load and car dimensions, travel distance, number of stops, shaft dimensions, headroom and pit depth. It should also identify whether there are restrictions on machine-room space, building power supply, access for installation or permitted working hours.

Where passenger accessibility is required, specify it from the outset rather than treating it as an optional add-on. This includes landing and car controls, door clear openings, handrails, visual and audible information, mirror placement where appropriate, and car dimensions suitable for wheelchair users. The Equality Act 2010 creates duties for service providers and employers, but practical accessibility also supports building usability and tenant confidence.

For goods lifts, define the actual load rather than a nominal estimate. Consider pallet dimensions, roll cages, wheeled containers, forklift interaction, loading frequency and whether attendants will travel with goods. Door configuration, sill strength, car protection and landing arrangements need to reflect the handling operation. A goods lift designed around occasional deliveries will not necessarily withstand a busy industrial workflow.

Set compliance and safety requirements early

Commercial lift procurement should be aligned with the project’s wider compliance strategy. Depending on the lift type and scope of work, relevant requirements may include the Lifts Regulations 2016, the Supply of Machinery (Safety) Regulations where applicable, the Health and Safety at Work etc. Act 1974, CDM Regulations 2015, LOLER and the Equality Act 2010.

Technical standards should be identified in the specification, rather than assumed. The BS EN 81 series is central to lift design and safety, with different standards applying to passenger and goods passenger lifts, accessibility, alarm systems, firefighters lifts, evacuation lifts and behaviour in the event of fire. A competent lift contractor or lift consultant can advise on the standards relevant to the proposed solution, but the building’s fire strategy must lead any decisions involving evacuation or firefighting use.

An evacuation lift is not simply a passenger lift labelled for emergency use. It requires coordinated consideration of fire compartmentation, power supplies, controls, communications, management procedures and the needs of users who may need assistance. Likewise, a firefighters lift must be integrated into the agreed fire and rescue strategy. These requirements need involvement from the fire engineer, building control team and relevant design disciplines at an early stage.

Evaluate the right lift technology

For most commercial passenger lift applications, traction technology is the natural starting point. It is typically well suited to medium and higher-rise buildings, offers efficient performance and can support a broad range of speeds and capacities. Machine-room-less traction arrangements can also assist where dedicated plant-room space is limited, although access, maintenance clearances and component replacement routes still need proper consideration.

Hydraulic lifts can remain appropriate for lower-rise buildings, especially where travel is limited and site conditions favour the arrangement. Their suitability should be assessed against duty cycle, energy use, environmental controls, space requirements and the client’s long-term maintenance expectations. Technology should not be selected solely because it has been used elsewhere in the estate.

Modernisation may offer a better outcome than full replacement where the lift structure and core components remain serviceable. Replacing controls, door equipment, drive systems, car finishes and safety components can improve reliability, accessibility and passenger experience. However, partial modernisation has limits. If guide rails, the car frame, shaft condition or major mechanical components are approaching the end of their useful life, a staged approach may create repeated disruption and poor value.

Compare tenders on whole-life value

The lowest tender price rarely represents the lowest cost of ownership. A well-run evaluation considers the quality and completeness of the proposed equipment, installation methodology, programme certainty, maintenance provision, energy performance and the availability of spare parts.

Ask tenderers to explain exclusions, assumptions and provisional sums. This is particularly important for existing buildings, where hidden shaft defects, electrical upgrades, asbestos controls, structural alterations and access limitations can alter the final project cost. A survey before tender will reduce uncertainty, but procurement documents should still set out how unforeseen conditions will be managed.

When assessing commercial lift contractors, look beyond the equipment brand. Confirm their experience with comparable buildings, their capacity to manage the installation programme, their approach to site safety, and their ability to provide responsive maintenance after handover. The commissioning process should include testing, certification, training for the building team, documentation and clear defect-resolution arrangements.

A maintenance agreement should be evaluated alongside the installation proposal, not several months later. It should define planned maintenance frequency, call-out response arrangements, what is included in the price, reporting format, component coverage and escalation routes. For critical sites such as hospitals, public buildings and major retail locations, resilience and response capability may be more valuable than a narrowly priced contract.

Protect the programme and the building users

Lift works affect more than the shaft. They can involve electrical shutdowns, builders’ work, fire-stopping, temporary access arrangements, noise, dust and restricted circulation. In occupied buildings, the contractor’s programme should show how these impacts will be managed and how users will be kept informed.

If an existing lift is being replaced, establish whether alternative accessible routes are available throughout the works. Where there is only one lift, programme planning becomes especially sensitive. Phased works, temporary measures and clearly communicated outage periods can reduce disruption, but none is a substitute for early planning.

Before practical completion, ensure the handover pack contains drawings, test certificates, declarations, maintenance information, rescue procedures, keys and access tools, and details of the responsible dutyholder. Arrange the first thorough examination under LOLER at the appropriate point and make sure the building team understands alarm testing, passenger release arrangements and fault reporting.

A procurement decision that supports the next decade

The best lift procurement process produces more than a compliant installation. It gives facilities teams a system that can be maintained, building users a reliable and dignified journey, and owners a clearer view of future costs. Swallow Lifts approaches commercial projects by matching technical detail to the way a building actually operates, because a lift’s value is measured long after the installation team has left site.